Before an excavator touches your yard, everything underground it — gas, electric, septic, and anything the utility company doesn't mark for you — needs to be found. Here's what that actually involves.

Get a Site Assessment →
Direct Answer

Every New Jersey court excavation requires an 811 utility locate request before digging, which gets gas, electric, water, and communication lines marked for free — but it does not cover private lines like irrigation, invisible fencing, septic systems, or an old oil tank. Those are on you to identify, and skipping that step is one of the costliest shortcuts on a court build. NJ Court Pros folds utility locating into pre-construction scheduling on every project, not as an afterthought once the excavator shows up.

What Has to Be Located Before Digging

📞

811 Utility Marks

Gas, electric, water, and communication lines owned by utility companies, marked with flags or paint after a free request — generally up to your meter or service entrance, not beyond it.

💧

Septic & Well Components

A leach field can never be built over or compacted, and wellheads need their own protection radius. Both carry health-department setback rules separate from your town's zoning setbacks.

🛢️

Old Oil Tanks

Older NJ homes sometimes have a decommissioned underground oil tank with no record on file. Uncovering one mid-excavation can trigger DEP reporting and remediation before work can continue.

🚿

Private Lines

Irrigation pipes and control wiring, invisible pet fencing, low-voltage landscape lighting, and French drains are not part of an 811 response — they only get found if you or a private locator find them first.

How It Fits Into the Build Schedule

Submit the 811 Request

Filed early in pre-construction, alongside permitting — not the week excavation is scheduled to start.

Wait for Marks

Typically a few business days for utility owners to flag and paint their lines. Conflicting or missing marks can add more.

Private Sweep If Needed

Irrigation, invisible fencing, septic, or a suspected old tank get checked separately, using as-built plans or a private locator.

None of this is a formality to rush through. A completed, honored utility locate is a hard prerequisite before excavation starts on every court we build — see our guide on how long a New Jersey court build takes for where this fits against permitting and weather windows.

Get a Full Pre-Construction Site Assessment

We check utilities, septic, wells, and site history before we ever quote a build — tell us about your property and we'll set up a visit.

Request a Site Visit →

Why This Step Gets Skipped — And Why It Shouldn't

Utility locating doesn't show up as its own line item on most bids, so it's easy to assume it's already handled or that it isn't worth the wait. It is worth the wait. A gas line strike can shut a site down for the rest of the day while the utility responds, and if the strike happened because marks were ignored or an 811 request was never filed, the contractor — and in some cases the homeowner — is on the hook for the repair. Compare that to the cost of the delay itself: a few business days at the front of the schedule, folded into the same window as permitting review, is a rounding error next to a utility strike and the project delay that follows it.

The part that actually catches people off guard isn't 811 itself — it's everything 811 doesn't cover. An irrigation main or invisible-fence wire that isn't on any utility map gets found the hard way if nobody asks about it first. The same goes for a septic leach field: courts need a properly graded, compacted sub-base (see our base preparation and grading guide), and compacting over an active leach field isn't something you can undo after the fact. On older properties, we also ask directly about any history of oil heat, since an undocumented underground tank is one of the few surprises that can turn a routine excavation into a regulatory issue overnight.

None of this is a reason to avoid building — it's a reason to build with someone who asks these questions before the site visit turns into a quote, not after the excavator is already on site. It also connects directly to construction insurance: knowing what liability a contractor carries for utility damage, and confirming locates happened before digging, are both things worth checking before you sign anything.

Utility Locating FAQs

Do I need to call 811 before building a court in New Jersey?+

Yes. Any excavation deeper than surface soil in New Jersey — and a court base easily qualifies — requires an 811 utility locate request before digging starts. The utility owners then mark gas, electric, water, and communication lines on your property with flags or paint, free of charge. Building the wait time into your schedule matters: marks typically take a few business days to come back, and a project that skips this step to save a few days is gambling with a much bigger delay if a crew hits a live line.

What doesn't get marked by an 811 request?+

811 covers utility company-owned lines, generally up to your meter or service entrance — it does not mark private lines on your own property. That means irrigation system pipes and wiring, invisible pet fencing, low-voltage landscape lighting cable, French drains, septic lines, and private wellheads are all your responsibility to identify. If you've had any of those installed, pull the as-built plans or the original installer's layout before excavation starts; if you don't have them, a private locator can sweep the area for a few hundred dollars, which is cheap insurance against cutting an irrigation main mid-pour.

What if my property has an old oil tank or a septic system?+

Both are common enough in older New Jersey homes that we ask about them on every site visit. An abandoned underground oil storage tank that was never properly decommissioned can trigger New Jersey DEP reporting and remediation requirements if it's uncovered during excavation — and on a home built before the 1980s, there's a real chance one exists even if it's not on any record you have. A septic tank or leach field can't be built over or compacted over at all, and local health department setback rules for septic components are separate from, and in addition to, your town's zoning setbacks. Both are worth confirming before a court layout is finalized, not after an excavator hits one.

What happens if a utility line gets hit during court construction?+

It varies by what's struck, but none of the outcomes are good. A gas line strike can halt work for the rest of the day while the utility responds, and in a bad case forces an evacuation. An electric line strike is a real safety hazard for the crew. A water or sewer line strike is usually just an expensive, disruptive repair. If 811 was called and lines were marked but a crew dug outside the marked area or ignored a mark, the contractor is typically on the hook for repair costs; if 811 was never called, liability and consequences get considerably worse. This is one of the reasons we treat a completed, honored utility locate as a hard prerequisite before any excavation begins, not a formality.

How much time should I budget for utility locating before construction starts?+

Plan on the marking request itself taking a few business days once submitted, and build that into the front of your schedule alongside permitting rather than after it — see our guide on how long a court build takes for how the phases stack up. If your site has any private lines — irrigation, invisible fencing, a septic system, a suspected old oil tank — add time for a private locate or record search on top of the standard utility marks, since those aren't part of the 811 response and can't be rushed once excavation is scheduled.