Short Hills isn't a separate municipality — it's a section of Millburn Township, and every permit for a court there runs through Millburn's zoning and tree preservation ordinances, not a Short Hills-specific code.
Get a Short Hills Site Visit →A backyard court in Short Hills typically runs $45,000-$80,000 for pickleball or $80,000-$150,000+ for a full tennis court, in line with the broader Essex County market and often toward the upper end of it. There's no separate Short Hills zoning office — every application is filed with Millburn Township. The two things worth confirming before you design anything: which zoning district your lot sits in, since setback rules differ by yard type, and whether the footprint requires taking down trees, since Millburn requires a permit for each one.
One Name, One Government
| What you might assume | What's actually true |
|---|---|
| A Short Hills zoning board reviews Short Hills projects | Millburn Township's zoning board and construction office handle every application, township-wide |
| Short Hills has its own building permit process | Permits are filed with Millburn, using the same forms and fee schedule as the rest of the township |
| Tree removal rules might be different in Short Hills | One tree preservation ordinance (Chapter 11) applies across all of Millburn, Short Hills included |
| "Short Hills, NJ" is a mailing convenience, not a zoning distinction | Correct — it's the ZIP-code-driven postal name for Millburn's northern and western sections |
It's a common enough mix-up that it's worth stating plainly: "Short Hills" describes a place, not a government. Every regulatory question below is a Millburn Township question, whether the mailing address says Short Hills or Millburn.

Ridge Terrain, Mature Canopy
Essex County sits on the first ridge west of Newark, and Short Hills' wooded, hillside lots are a clear example of it — grade and tree cover shape a court layout here more than lot size does.
- ✓ Tree removal permit required per tree, township-wide
- ✓ Separate zoning provisions for front vs. corner and side yards
- ✓ Sloped lots often need retaining or a stepped pad before a court goes down
- ✓ Owner-occupied 1-2 family homes get tree permits at no cost
If Your Court Footprint Requires Tree Removal
A permit is required for each tree
Millburn's tree preservation ordinance (Township Code, Chapter 11) requires a separate application per tree removed, not one blanket permit for the project.
Larger projects need a Tree Restoration Plan
The plan identifies each tree's location on a property survey along with its species and diameter, and proposes replacement species and placement — build this into your site plan before you finalize a court layout, not after.
No cost for most homeowners
Tree removal permits are issued at no charge for owner-occupied single- and two-family dwellings, which covers the large majority of backyard court projects in the township.
Fines apply for unpermitted removal
Cutting a tree without a permit is a real risk, not a formality — violations of the ordinance can draw a fine of up to $2,000 per tree, or worse. Confirm the permit before a crew shows up with a chainsaw, not after.
Exact figures and current fee schedules should always be confirmed with Millburn Township's zoning and construction offices directly — ordinances get amended, and this is meant as a planning reference, not a substitute for the township's own application materials.
Find Out What Your Short Hills Lot Requires
We'll confirm your zoning district, check whether the layout needs a Tree Restoration Plan, and price any retaining the grade calls for — before you commit to a design.
Request a Quote →Planning a Court on a Short Hills Property
The first thing to sort out on any Short Hills project has nothing to do with the court itself. Short Hills is a place name — it shows up on mail, on real estate listings, on the ZIP code — but it isn't a municipality. The entire area is part of Millburn Township, governed by one zoning ordinance, one construction office, and one tree preservation code. There's no separate Short Hills permit process to research, which actually simplifies things once you know to start with Millburn Township directly instead of searching for a local board that doesn't exist.
What Millburn's code does have is real specificity once you get into it. The township's Development Regulations and Zoning Ordinance (Article 6) sets different setback standards depending on where a structure falls on the lot — front-yard minimums run 30 feet on most streets, dropping to 15 feet along Millburn Avenue and Main Street or matching the established average on a block where that pattern already exists — with separate provisions again for corner and interior side yards. A backyard court counts as an accessory structure, and which set of rules applies depends on your specific zoning district and lot configuration. There's no single number that works as a rule of thumb here, which is exactly why we walk the zoning district and lot lines before pricing a layout rather than after. Our statewide permits and zoning guide covers how this kind of yard-specific setback code compares to simpler single-number ordinances elsewhere in New Jersey.
Terrain is the other variable that shapes a Short Hills build more than most homeowners expect going in. Essex County sits on the first ridge west of Newark, and Short Hills' hillside lots near South Mountain Reservation are a clear example of what that means in practice: a backyard that looks flat from the deck often drops several feet across the footprint a court actually needs. Leveling that grade with retaining walls, engineered fill, or a stepped pad is frequently the largest line item on a Short Hills bid, ahead of the surface itself — the same dynamic our Essex County cost guide covers for the county as a whole, and one reason Short Hills pricing tends to sit toward the top of that county's range rather than the middle.
Tree cover compounds the grading question rather than replacing it. Mature trees on a sloped lot mean root systems are often threaded through exactly the soil a court's base needs to be compacted and graded, and removing a tree doesn't remove the roots underneath it — see our land clearing and tree removal cost guide for why leftover roots under a slab cause problems years after the stump itself is gone. Millburn's tree preservation ordinance requires a permit for each tree removed and, on larger projects, a Tree Restoration Plan mapping out what comes down and what gets planted back — worth building into the design phase, since redesigning a court footprint after a tree permit gets denied costs more time than planning around the trees from the start.
Once the township-specific questions are settled, the rest of a Short Hills build tracks the same fundamentals as any sloped, wooded Essex County lot. A post-tension concrete base is worth the premium over asphalt here specifically because it resists the freeze-thaw cracking that a graded, retained pad is already more exposed to than a flat, undisturbed lot — see our concrete vs. asphalt base guide for the tradeoff. And because Short Hills lots are large enough that a full tennis footprint usually fits without a variance, it's worth deciding early whether tennis, pickleball, or a blended-line multi-use court actually fits how the household will use it — our pickleball vs. tennis comparison walks through the footprint and cost difference before you commit a design to either.
Related Guides
Backyard Court Cost in Essex County, NJ
Real pricing ranges and why ridge lots run above the New Jersey average.
HOA & Zoning Rules for Backyard Courts in Essex County
Setbacks, coverage limits, and approval steps across the county.
Land Clearing & Tree Removal Cost for Court Installation
Why leftover roots under a slab cause problems years later.
Fitting a Court on a Sloped Montclair Lot
How cut-and-fill, retaining walls, and stepped pads work on ridge grades.
Short Hills Court Installation FAQs
Is Short Hills its own town for zoning and permit purposes?+
No. Short Hills is an unincorporated section of Millburn Township, not a separate municipality — there's no separate Short Hills zoning board or building department. Every permit, variance, and tree removal application for a Short Hills address gets filed with Millburn Township, the same as anywhere else in the township.
How much does a backyard court cost in Short Hills?+
Pricing tracks the broader Essex County range: roughly $45,000-$80,000 for a dedicated pickleball court, $80,000-$150,000+ for a full tennis court, and $35,000-$70,000 for basketball. Short Hills projects often land toward the upper half of those ranges — lots tend to be larger than the Essex County average, but many sit on the same ridge grade that drives up site prep and retaining costs across the township.
Do I need a tree removal permit to build a court in Millburn?+
Almost certainly, if the footprint is anywhere near existing trees. Millburn requires a separate tree removal permit for each tree taken down and, for larger projects, a Tree Restoration Plan showing each tree's location, species, and diameter along with a proposed replacement. Permits are issued at no cost for owner-occupied one- and two-family homes, but violations of the township's tree preservation ordinance carry fines of up to $2,000 per tree.
What setback rules apply to a backyard court in Short Hills?+
It depends on the zoning district and which yard the court falls into — Millburn's zoning ordinance sets separate provisions for front yards versus corner and interior side yards, and a court is reviewed as an accessory structure under whichever set applies to your lot. There's no single number that covers every Short Hills property, which is exactly why a zoning check before finalizing a layout matters more here than in townships with a flatter, more uniform code.
How long does a Short Hills court project take from quote to first game?+
Plan on 6-10 weeks once permits clear, longer if the footprint requires a Tree Restoration Plan or the lot needs retaining work for grade. Open, gently sloped lots on the flatter parts of the township move faster; heavily wooded lots along the ridge routinely add a few weeks for tree permitting and excavation around root systems before a crew ever pours a pad.
Build Your Short Hills Court With a Local Team
Tell us your zoning district and lot layout, and we'll confirm setback rules and tree permit needs before quoting your project.
Request a Quote →